19 Nov

Updated H31-341-ENU Free Online Test – Real H31-341-ENU Exam Questions

When preparing for HCIP-Transmission certification exam, candidates are recommended to choose real H31-341-ENU exam questions as the preparation materials to achieve the success. Updated H31-341-ENU exam questions were released to ensure that you can pass HCIP-Transmission certification exam.

Real H31-341-ENU exam questions are great with 331 practice questions and answers, which could be the best preparation materials online. HCDAtest ensures that you can pass HCIP-Transmission H31-341-ENU exam in the first attempt. We have H31-341-ENU free online test to help you check the quality of HCIP-Transmission H31-341-ENU exam. Below are 25 free questions, please read and test. Any other questions, please contact us freely: [email protected].

Begin to Test:

1. Generally in NG WD systems, the full-wave incoming fiber optical power generally does not exceed 20dBm. Which is the main reason?

Question 1 of 25

2. Which of the following are the logical ports on the client side of the board in the standard mode?

Question 2 of 25

3. When creating a single-station optical crossover, an error message appears "The direction of the fiber and cable is incorrectly selected". Which are the possible reasons?

Question 3 of 25

4. The following description of Flexible ROADM, which is wrong?

Question 4 of 25

5. The following description about using the synchronization method to create optical fibers, which is wrong?

Question 5 of 25

6. When using the path method to create OCh, which of the following service layer paths is necessary?

Question 6 of 25

7. The length range of the DATA field in the Ethernet frame structure is?

Question 7 of 25

8. When the main control board is configured with a single board, which step is required to replace the single board than when the main control board is configured with a dual configuration?

Question 8 of 25

9. Which of the following statements about the MPLS-TP OAM level is correct?

Question 9 of 25

10. The following description of the internal port attributes of the Ethernet board, which is wrong?

Question 10 of 25

11. MPLS APS is a network protection mechanism, which realizes service switching through the detection function of MPLS OAM.

Question 11 of 25

12. Which of the following SOM systems cannot be monitored?

Question 12 of 25

13. For emergency treatment of business interruption, fault location should be carried out as soon as possible, and then the business should be restored.

Question 13 of 25

14. When a signal with a standard Ethernet frame length of 64 Bytes is connected to the Ethernet board, if the QinQ function is enabled, what is the actual frame length of the signal inside the board?

Question 14 of 25

15. You need to perform () operation before querying the error code and optical power on the network management system, otherwise the corresponding teaching data cannot be queried.

Question 15 of 25

16. The setting of alarm reversal is based on?

Question 16 of 25

17. In the characteristic test of the splitter (combiner), what standard is required for the isolation test?

Question 17 of 25

18. When performing a 10-minute error-free test on a certain wavelength division channel, the local end uses an SDH analyzer to interconnect with the client-side interface of the OTU board, the OTU client interface at the opposite end needs to perform fiber self-looping, and solid attenuation must be added during self-looping.

Question 18 of 25

19. The maximum output optical power of an optical amplifier OBU is 20 dBm, and when it is used in the C-band 80 passive system, how much dBm should the single-wave standard output optical power be?

Question 19 of 25

20. When the input optical power of the OAU amplifier at the receiving end is lower than the nominal optical power, the following operations which is wrong?

Question 20 of 25

21. Since the CWDM system does not use optical amplifiers, the focus of commissioning is whether the light reception of the OTU board is reasonable.

Question 21 of 25

22. By default, the network element automatically backs up the network element database to the FLASH library every 30 minutes.

Question 22 of 25

23. When using the path method to create a client path, if there is an RLOS alarm on the line board, the path cannot be created.

Question 23 of 25

24. The transmission plane mainly completes the functions of optical signal transmission, multiplexing, configuration protection switching, and switching connection. And ensure the reliability of the transmitted optical signal. But the exchange action of this layer is carried out under the action of the management plane and the control plane.

Question 24 of 25

25. For ODUk SNCP protection, if the pass-through site is an electrical relay station, it is recommended to configure the SNCP type as SNC/I when configuring the protection.

Question 25 of 25


 

Leave a Reply

This site uses Akismet to reduce spam. Learn how your comment data is processed.


Recent Posts


Tags

H12-211-ENU H12-211-ENU online test H12-211-ENU practice test H12-221 H12-221-ENU H12-221-ENU online test H12-222 H12-222-ENU H12-223 H12-223-ENU H12-261 H12-261-ENU H12-261-ENU online test H12-261-ENU practice test H12-261-ENU questions and answers H12-311-ENU H13-511-ENU H13-511-ENU exam dumps H13-511-ENU latest dumps H13-511-ENU questions and answers H13-511-ENU real exam questions H13-511-ENU real questions H13-511-ENU test prep H13-511-ENU training materials H13-611-ENU H13-623-ENU exam dumps H13-629-enu H19-301-ENU exam dumps H19-307-enu H19-308 H19-308-ENU H19-308-ENU exam dumps H31-211-ENU H31-211-ENU exam dumps HCDA (Carrier IP) HCNA HCNA-Cloud-BCCP HCNA-HNTD HCNA Storage HCNP HCNP-R&S-IENP HCNP-Storage Huawei Certified Internetwork Expert-Routing & Switching Huawei Certified Network Associate-Building Cloud Computing Platform Video Conference